Construction of infrastructure system of Road No. 4, Road No. 9, Tu Do Avenue and Classing of lots A9, A10, A13A, A13B, A18 and temporary open ditch for Suoi Cat VSIP Quang Ngai Industrial Park - Phase 1B
Project information
Name of construction:
Construction of infrastructure system of Road No. 4, Road No. 9, Tu Do Avenue and Classing of lots A9, A10, A13A, A13B, A18 and temporary open ditch for Suoi Cat VSIP Quang Ngai Industrial Park - Phase 1B
Location:
VSIP Quang Ngai
Investor:
VSIP Quang Ngai CO., LTD.
Land area:
519,6 ha
Consulting service:
Construction management consulting service
Year of implementation:
2024
Detail
Construction of infrastructure system of Road No. 4, Road No. 9, Tu Do Avenue and Classing of lots A9, A10, A13A, A13B, A18 and temporary open ditch for Suoi Cat VSIP Quang Ngai Industrial Park - Phase 1B