Infrastructure system construction of Road No. 4, Road No. 8, Tu Do Avenue and Classing the ground of lots A10, A13A, A13B, A18 of Industrial Park Phase 1B and Classing the remaining ground of lot A19 and drainage system surrounding lot A19, phase 1A, VSIP Quang Ngai