NAGECCO

Groundbreaking Ceremony Held for New Ground Support Services Facility at Long Thanh International Airport

 

Dong Nai Province, May 25, 2025 – The groundbreaking ceremony for the "Investment Project for the Construction and Business of Aircraft and Aviation Equipment Repair and Maintenance Services, alongside Ground Commercial Technical Services No. 1" took place today at Areas KV1 – E-07 and E-11 within Long Thanh International Airport, Dong Nai Province. This event marks a significant stride in the development of Vietnam's aviation infrastructure, enhancing service quality at Long Thanh International Airport.

This project is more than just an investment item; it reflects the strategic vision of Vietnam Airlines and VIAGS to transition towards an integrated aviation service provider model.

The project is being implemented to meet the increasing demand for professional maintenance and specialized repair services for aviation vehicles, while simultaneously elevating ground services at Long Thanh International Airport. Spanning an impressive 7,045 square meters, the facility will comprise:

  • A two-story maintenance building standing 18.45 meters high, with a floor area of 2,824.9 square meters.
  • A four-story administration building reaching 27.65 meters high, with a total floor area of 5,992.4 square meters.
  • A synchronized infrastructure system, including a wastewater treatment plant with a capacity of 150 cubic meters per day, a firefighting pump station adhering to stringent safety standards, an automated vehicle wash area, and 755.5 square meters of meticulously planned green space.

Notably, the project utilizes modern construction technology, boasting a land use coefficient of 0.851, a building density of 29.2%, and a service life of over 50 years. With a total investment of VND 782 billion, the project will not only comprehensively upgrade operational capabilities but also create hundreds of high-quality jobs, contributing to the sustainable development of Vietnam's aviation industry.



With extensive experience in the construction sector, National General Construction Consulting Joint Stock Company (NAGECCO) is proud to assume the role of project management consultant. NAGECCO's team of experts will be directly involved in the comprehensive management and oversight of the project's implementation, from design and cost estimation, contractor selection, to quality, progress, and cost control, as well as acceptance testing and handover of the facility. With a high sense of responsibility, strong professional competence, and a professional working methodology, NAGECCO is committed to close collaboration with the project owner to ensure the project is executed in compliance with legal regulations, on schedule, and achieves the highest quality and efficiency.

 

The VIAGS ground technical project at Long Thanh International Airport is a foundational strategic step. It will not only enhance the quality of airport operations but also provide a development impetus for the entire Vietnamese aviation industry. This represents a sustainable, modern, and high-potential investment model contributing to the goal of establishing Long Thanh as an "aviation hub" for the region.

The project's groundbreaking ceremony has ushered in a new chapter in the development of aviation infrastructure in Vietnam. With its substantial investment and modern scale, the project promises to become a significant highlight at Long Thanh International Airport, contributing to the socio-economic development of the region and the entire country.

 

logo
New heights
400
Personnel
50
Years of experience
200
Projects
200 billion
Revenue of 2023
Receive information
Nagecco - General Construction Consulting Joint Stock Company
headquarters
29 Bis Nguyen Dinh Chieu street, Dakao Ward, District 1, Ho Chi Minh City
Connect with us
Contact us
Email: [email protected]
Hotline: + 84 28 39 100 631, + 84 28 39 100 632, + 84 28 39 100 633, + 84 28 39 100 634
Information about us
Copyright © 2022 NAGECCO. All rights reserved.