From the very first days of the project, when the construction site was still a rough expanse of earth awaiting its first foundation excavations, the engineers and experts of NAGECCO were already on the ground, fully committed to our supervision consultancy mission. To us, this was never merely a technical oversight role; we consider ourselves an integral part of the journey to build a nationally strategic project – a convergence of cutting‑edge waste‑processing technology and the ambitious vision for clean, sustainable energy development.

From Groundbreaking to Present: Numbers and Silent Dedication

Throughout the many months that have passed, under the scorching sun of Cu Chi's rugged terrain or during sudden, torrential downpours, NAGECCO engineers have remained ever‑present on‑site. We have meticulously inspected every single detail of rebar fabrication, rigorously assessed concrete quality, and continuously cross‑checked design blueprints against actual field execution. Today, a critical milestone has been achieved: the entire structural works up to elevation ±0.00 have been completed on schedule, satisfying all criteria for structural integrity, load‑bearing capacity, and long‑term durability. This solid foundation now paves the way for the next major phase – the erection of structural steel frameworks for key facilities, including the incinerator units, flue‑gas treatment systems, the turbine hall, and the fuel storage area.

Every construction stage has been governed by a tightly controlled quality assurance regime – from the inspection and approval of incoming materials, through close monitoring of construction methodologies, to precise surveying and alignment of grids and axes. Our team has consistently maintained daily reporting protocols and weekly technical coordination meetings with the Site Command Board, enabling swift resolution of any emergent issues. Above all, occupational safety has remained our paramount priority – every work zone is subject to rigorous checks of barricades, scaffolding systems, lifting equipment, and hazard signage, all in pursuit of our unwavering goal: zero incidents, zero accidents throughout the entire project lifecycle.

More Than an Industrial Facility – An Environmental and Energy Mission

What sets this project apart, above all, is its profound strategic significance. With a designed processing capacity of approximately 2,000 tonnes of municipal solid waste per day, the Tam Sinh Nghia Waste‑to‑Energy Plant in Cu Chi is not merely a solution to urban waste congestion; it simultaneously generates renewable electricity, contributing substantially to the reduction of greenhouse gas emissions compared to conventional landfilling. This is one of the nation's specially‑designated mega‑projects, approved at the highest governmental level, demanding the most stringent environmental performance standards (with flue‑gas emissions meeting European benchmarks), employing circulating fluidised‑bed combustion technology, and utilising high‑efficiency heat recovery systems. For these reasons, the role of a supervision consultant like NAGECCO extends far beyond checking drawings and paperwork – we are the custodians of quality for a greener future, a future where waste is transformed into a valuable resource, where the white plumes rising from smokestacks are nothing but purified water vapour.

On This Journey, NAGECCO Proudly Contributes Its Share

Every forward step of this project bears the silent imprint of our supervision team's relentless efforts. There have been long, sleepless nights when our engineers stood watch over massive concrete pours; impromptu midday meetings to urgently devise remedial solutions for unexpected foundation issues; and those small but profound moments of quiet pride as we watched steel columns rise one by one above the ground plane. Yet every single challenge has been worthwhile – because we know that we are accompanying an iconic project of the Saigon region, where advanced technology and environmental responsibility are cast into concrete, forged into steel, and woven through miles of intricate piping.

The road ahead remains long, with immense workloads looming in structural steel erection, mechanical systems integration, and equipment commissioning. But with our unyielding sense of responsibility, our persistent on‑site presence, and the deep technical expertise of the entire NAGECCO collective, we firmly commit to staying closely engaged with the construction site, ensuring that every work package achieves optimal quality standards. Our ultimate goal is to help bring the Tam Sinh Nghia Waste‑to‑Energy Plant to a successful, on‑schedule completion – worthy of the high expectations placed upon it by both the investor and the wider community. Because to us, every project is not merely a professional milestone; it is a source of pride – a legacy we help build for a greener, cleaner, and more sustainable future for generations yet to come.

logo
New heights
400
Personnel
50
Years of experience
200
Projects
200 billion
Revenue of 2023
Receive information
Nagecco - National General Construction Consulting Joint Stock Company
headquarters
29 Bis Nguyen Dinh Chieu Street, Saigon Ward, Ho Chi Minh City
Connect with us
Contact us
Email: info@nagecco.com
Hotline: + 84 28 39 100 631, + 84 28 39 100 632, + 84 28 39 100 633, + 84 28 39 100 634
Information about us
Copyright © 2022 NAGECCO. All rights reserved.