NAGECCO

CHARM LONG HAI RESORT & SPA

CHARM LONG HAI RESORT & SPA

 

Investor: Phuc Dat Hotel Tourism Co., Ltd

Location: Long Hai Town, Long Dien District, Ba Ria - Vung Tau Province

Structural, MEP & Infrastructure design contractor: NAGECCO - Structural Center 1 and Mechanical and Electrical Engineering Consulting Center.

 

Scale: 1 basement, 13 floors and roof.

GFA: 79.043,7 m2

 

  • Main structural solution:

Foundation option: With the scale of the project and due to the geological tectonics in the construction area, the Long Hai area has thin rock seams, uneven thickness, the depth appears to change continuously, the pile foundation option DTH drilling D600 combined with D400 is the most suitable option in terms of feasibility and economy for investors.

 

Entire reinforced concrete column, beam, and floor frame system. To optimize the space of the hotel lobby, basement restaurant and first floor, the reinforced concrete transfer beam solution on the second floor is used to reduce the number of columns.

 

Ballroom requires a span of 22m, the structural plan uses a 2.2m high steel truss system to meet architectural requirements.

 

Year of implementation: 2018 – 2022.

 

 

 

 

 

 

logo
New heights
400
Personnel
50
Years of experience
200
Projects
200 billion
Revenue of 2023
Receive information
Nagecco - General Construction Consulting Joint Stock Company
headquarters
29 Bis Nguyen Dinh Chieu street, Dakao Ward, District 1, Ho Chi Minh City
Connect with us
Contact us
Email: [email protected]
Hotline: + 84 28 39 100 631, + 84 28 39 100 632, + 84 28 39 100 633, + 84 28 39 100 634
Information about us
Copyright © 2022 NAGECCO. All rights reserved.